New Turnkey Hard Seltzer Brewery
The flexible integration of old and new has enabled not only production of a range of both major beers and up and coming scale-ups of craft beers, but also innovative products including a new Hard Seltzer range
Overall Scope
- Design Study
- Turn-Key Implementation
- Engineering
- Manufacturing
- Group Brewing and Cellar equipment
- Automation
- Group collaboration on Cold Block
Engineering Services offered
- FEL 2.2 Study with phased expansion (1 to 3)
- Detailed Design – Phases 1 and 2 – From Material Handling through Brewhouse and Cellars, plus CIP, Water and Utilities
- PFD, P&IDs. Utilization and 3D – Modelling
- Tender Specifications – FDS Development
- Implementation – Phase 1
- Brewhouse and cellar equipment procurement
- BrewMaxx automation development and FAT
- Installation, supervision and commissioning
Offering the Hard Seltzer Industry
- Concept Studies / Front-End Loading (FEL 1-3)
- Detailed Design
- Specialist Equipment Design and Manufacture
- Leading Hard Seltzer Technologies
- Process Engineering
- Project Management
- Functional Safety and Hazardous Area Design
- Automation and Control